[1]〖JP3〗Layne K,Lee J.Developing fully functional egovernment:A fourstage model[J].Government Information Quarterly,2001,18:122-136.〖JP〗 [2]McTigue Ellig Richardson.5th Annual Performance Report Scorecard:Which Agencies Best Inform the Public[Z].2004-04. [3]Paul J Longo.The Performance Blueprint,An Integrated Logic Model Developed to Enhance Performance Measurement Literacy:The Case of PerformanceBased Contract Management[C].2002 Annual Conference of the American Evaluation Association,2002-06:6-10. [4]Poister T H.A study of performance measurement systems in state transportation departments[J].Public Works Management & Policy,1997,1(4):323-341. [5]Poister T H,Gregory Streib.Performance measurement in municipal government:Assessing the state of the practice[J].Public Administration Review,1999,59(4):225-335. [6]SaacHenry Kester,Chris Painter,Chris Barnes.Management in the Public Sector:Challenge and Change[M].2nd ed.London:Thomson Business Press,1997:89-92. [7]〖JP3〗Urban Institute,ICMA.Comparative Performance Measurement:FY 1995 Data Report[R].Washington, DC:Urban Institute and ICMA,1997.〖JP〗 [8]〖JP3〗Fenwick John.Managing Local Government[M].London:Chapman and Hall,1995:104-143.〖JP〗 [9]Flynn Norman.Public Sector Management[M].3rd ed.New Jersey:Prentice Hall,2010:173. [10]Robert S Kaplan,David P Norton.The balanced scorecard measures that drive performance[J].Harvard Business Review,1992(1-2):71-79. [11]Fitzgerald L,Johnston R,Brignal S,et al.Performance Measurement in Service Businesses[M].Unwin,Surrey:The Chartered Institute of Management Accountants,1991. [12]〖JP3〗Papageorgiou M.Dynamic modeling,assignment,and route guidance in traffic networks[J].Transpn.Res.-B,1990,24(6):471-495.〖JP〗 [13]Messmer A,Papageorhiou M.Automatic control method applied to freeway network tfaffic[J].Automatica,1994,30(4):691-702. [14]〖JP2〗Goldstein N B.A decentralized control strategy for freeway regulation[J].Transpn.Res.B, 1982,16(4):190-279.〖JP〗 [15]〖JP2〗Mahmoud M S.Optimization of freeway traffic control problems[J].Optimal Control Application and Methods,1988,9:37-49.〖JP〗 [16]〖JP2〗Zhang H.Some general results on the optimal ramp control problems[J].Transpn.Res.C,1996, 4(2):51-69.〖JP〗 [17]Ritchie G.Simulation of freeway incident detection using artificial neural networks[J]. Transpn.Res.-C,1993(1):203-217. [18]Smith B L,Demetsky M J.Shortterm Traffic Flow Prediction:Neuralnetwork Approach[Z].Trans portation Research Record 1453,1996:98-104. [19]Corinne L.An urban traffic flow model integrating neural networks[J].Transportation Resea ch C,1997,5:287-300. [20]Lam H K,Huang H J.Dynamic user optional traffic assignment model for many to one travel demand[J].Transportation Science,1995,29B:160-243. [21]Ran R.Anew class of instantaneous dynamic useroptimal traffic assignment models[J].Operat ions Res,1993(l):41. [22]Kumar R,et al.Optimal supervisory control of discrete event systems[J].SIAM J. Control and Optimization,1995,33:419-439. [23]Papageorgiou M.Modeling and realtime control of traffic flow on the southern part of boulevard peripherique in Paris:Part I:Modeling[J].Tranpsn.Res.-A,1990,24(5):345-359. [24]〖JP3〗Newell G F.Comments on Traffic Dynamics[J].Transpn.Res.-B,1989,23(5):386-389.〖JP〗 [25]Grewal M S,Payne H J.Identification of parameters in a freeway traffic model[J].IEEE Trans. on SMC,1976,6(3):176-185. [26]Cremer M,Papageorgiou M.Parameter identification for a traffic flow model[J].Automatica, 1981,17(6):837-843. [27]Cremer M,May A D.An extended traffic flow model for inner urban freeways[Z].Proc.of 5th IFAC/IFIP/IFORS Intern. Conf.on Control in Transpn System,1986:239-244. [28]Nahi N E.Freeway-traffic data processing[J].Proceedings of the IEEE,1973,61(5):537-541. [29]Willsky A S.Dynamic model-based techniques for the detection of incidents on freeways[J]. IEEE Trans.on AC.,1980,25(3):347-359. [30]Stephanedes J.Freeway incidents detection through filtering[J].Transpn.Res.-C.,1993,1(3): 218-233. [31]张瑞.我国政府绩效评估的利益分析[J].南京师大学报(社会科学版),2010,6(6):24-25. [32]吴江.基于价值管理的政府绩效评估体系研究[D].长春:吉林大学,2007:88-89. [33]彭国甫.地方政府公共事业的管理绩效评价与治理对策研究[D].长沙:湖南大学,2005:79-80. [34]史忠科.河流水质模型求解的Chebyshev正交多项式方法[J].控制与决策,2005(6):709-712. [35]于少伟,史忠科.信号交叉口集聚车辆跟驰模型[J].中国公路学报,2014(11):93-100. |